A missed LOLER examination is rarely caused by a team not knowing the rules. More often, the equipment register is incomplete, an accessory is stored away from the main asset, or responsibility sits between a site team, contractor and central compliance function. Clear control of LOLER inspection intervals turns a recurring legal obligation into visible, planned work with evidence behind it.
The key point is simple: not all lifting equipment follows the same timetable, and a routine visual check is not a substitute for a formal thorough examination. Site managers need to know what is due, why it is due, who is responsible and where the report can be retrieved when an auditor, client or regulator asks.
The Standard LOLER Inspection Intervals
Under the Lifting Operations and Lifting Equipment Regulations 1998, lifting equipment must be thoroughly examined by a competent person at defined intervals, or in accordance with a written scheme of examination. In everyday operations, the usual intervals are:
- every six months for lifting equipment used to lift people, such as passenger lifts, platform lifts and equipment used to raise workers;
- every six months for lifting accessories, including slings, shackles, chains, eyebolts and lifting beams;
- every 12 months for other lifting equipment, such as forklift lorry lifting attachments, goods lifts, hoists and cranes.
These are maximum periods, not a reason to wait until the final day. The interval runs from the last thorough examination, not from the date a report was uploaded, a purchase order was raised or a reminder was noticed.
Learn MoreMaintenance & SchedulingHow examination due dates sit on a live schedule, so the interval is visible before the last day arrives.A competent person can specify different frequencies through a written scheme of examination. This may be appropriate where equipment has a known usage pattern, is in a controlled environment or needs closer monitoring because of the work it performs. A written scheme is not an informal decision to inspect less often. It must be drawn up by a competent person and set out the equipment covered, the examination requirements and the intervals to be followed.
Thorough Examination Is Not the Same as a Routine Check
Teams often use the word inspection for every type of check. Operationally, that creates risk. LOLER distinguishes a thorough examination from pre-use checks, routine maintenance and other inspections required under the Provision and Use of Work Equipment Regulations 1998.
A thorough examination is a detailed assessment by a competent person. They must have the practical and technical knowledge to identify defects or weaknesses, understand the equipment and its intended use, and be sufficiently independent to make objective findings. In many cases, this is an external specialist, although an internal examiner may be suitable where genuine competence and independence can be demonstrated.
Pre-use checks are different. A user might check a sling for cuts, damaged stitching, missing identification or deformation before use. A forklift operator may complete daily checks. These checks matter because they can identify an immediate defect between formal examinations, but they do not reset the LOLER examination clock.
Maintenance also has a different purpose. Servicing keeps equipment in working order. A service visit can coincide with a thorough examination, but it should not be assumed to include one unless the documentation clearly confirms it. The report, examiner and scope need to stand up to scrutiny.
When an Examination Is Needed Outside the Normal Interval
The six and 12-month rules do not cover every trigger. A thorough examination may also be required before lifting equipment is first put into service. This applies where the equipment has not been supplied with a declaration of conformity, or where it is being used for the first time after assembly at a new location and its safety depends on how it has been installed.
Further examination is required after exceptional circumstances that could affect safe operation. This is a practical judgement, but typical examples include overloading, impact damage, a significant repair, failure of a safety device, a major alteration, prolonged periods out of use or exposure to fire, corrosion or severe weather.
Consider a chain hoist that has been dropped during a relocation. It may look undamaged, and its scheduled examination may be months away. That does not make it safe to return to service. The incident should trigger quarantine, assessment and, where necessary, thorough examination before use resumes.
This is where incident reporting, maintenance records and the asset register need to connect. If these records live in separate systems, a site can close an incident without the lifting asset ever being reviewed. The evidence trail then has a gap exactly where an investigation will look first.
Start with a Complete Lifting Equipment Register
The quality of your compliance programme depends on the register. If an item is not recorded, it cannot be scheduled, assigned or evidenced. The register should cover fixed and mobile lifting equipment, lifting accessories and equipment hired in for site work.
For each asset, record a unique identifier, location, responsible site or department, equipment type, serial number where available, safe working load, intended use, last examination date, next due date and the applicable interval or written scheme. Attach the current certificate or report directly to the asset record rather than leaving it in a contractor email chain or shared folder.
Accessories deserve particular attention. A lifting operation may involve a crane with a well-managed annual examination record, while the sling, shackle or spreader beam attached to the load has no visible history. Each accessory needs identification and traceability. Where accessories are grouped in sets, the control method must still make it possible to identify what has been examined and what has been withdrawn.
For multi-site organisations, location data is equally important. Equipment moves. A centrally held record that says an item belongs to Site A is not enough if the asset has been transferred to Site C, placed in storage or sent to a contractor. Asset movements should preserve the examination history while updating ownership and next actions.
Learn MorePremises & Asset ManagementHow each lifting asset is recorded against its site, so the current report stays with the equipment when it moves.Assign Responsibility Before a Due Date Becomes an Incident
The dutyholder is responsible for ensuring examinations happen. In practice, responsibilities can be shared across facilities, operations, procurement, engineering and contractors, but accountability cannot be left vague.
Set a clear owner for each equipment group and define who can arrange examinations, approve remedial work, quarantine unsafe equipment and verify that reports have been received. If a landlord manages a passenger lift or a contractor supplies a mobile crane, confirm the arrangements in writing. Contractual responsibility does not remove the need for the organisation using the equipment to assure itself that the required evidence exists.
Planned reminders should begin early enough to deal with access, contractor availability and defects identified during the examination. A report completed on the due date may be technically within interval, but it leaves little room to respond if the examiner finds a fault that takes the equipment out of service.
A sensible workflow includes advance notifications, an assigned task, proof of completion, report review and a linked corrective action for every defect. Escalation should be automatic when a due date approaches without confirmed completion. This gives central teams a live view of risk without chasing sites through emails and spreadsheets.
What a Defensible LOLER Record Looks Like
A thorough examination report should identify the equipment, examination date, safe working load where relevant, defects found and the examiner's findings. It should also state whether the equipment is safe to continue using and, where a defect is identified, the deadline for remedial action or any requirement to remove it from service.
Reports must be acted on, not simply filed. Where a defect involves an existing or imminent risk of serious personal injury, the competent person has duties to report it promptly to the relevant enforcing authority as well as the dutyholder. That is not the time to search for an old certificate or establish who owns the asset.
Keep reports available for the required retention period and maintain a clear history of examinations, repairs, restrictions and changes in status. During an audit, the real question is often not whether a certificate exists. It is whether the organisation can show that it understood the finding, controlled the risk and closed the action.
Learn MoreIssue Reporting & RequestsHow a defect on the examination report becomes an assigned action, with isolation, repair and closure staying on the record.A connected system such as CalmCompliance can bring the asset, examination schedule, contractor task, report, defect action and audit trail into one record. That reduces duplicate administration, but more importantly, it makes the evidence available when operational decisions need to be made.
Build Intervals into Normal Site Control
LOLER compliance works best when it is part of normal asset management, not a monthly spreadsheet exercise. Review the lifting equipment register after site moves, acquisitions, refurbishments, equipment hire and incident investigations. Train users to recognise damage and give them a simple route to report and quarantine suspect equipment.
The practical test is straightforward: can a manager identify every item of lifting equipment on a site, see its examination status, find the latest report and prove that every defect was controlled? If the answer is yes, LOLER inspection intervals stop being a deadline risk and become part of a safer, better-controlled operation.
Keep reading
Get the next article before everyone else
Join the weekly brief for new posts, product updates, and guides you can use on site straight away.
- New posts
- Product Updates
- Practical guides
We care about your data. Read our privacy policy.