Use this record for a periodic structural inspection or in response to a suspected or visible structural defect. Record observations, issues, advice, actions, interim controls and the status of follow-up work.
School and inspection details
School name
RequiredEnter the name of the maintained or academy school.
Written response
Responsible body
RequiredEnter the local authority, academy trust, governing body or other responsible body responsible for the school estate.
Written response
Building or area inspected
RequiredIdentify the building, block, room, elevation, roof area, external area or other location covered by this record.
Written response
Inspection date
RequiredEnter the date on which the inspection or condition review took place.
- Day
- Month
- Year
Reason and type of inspection
RequiredSelect all that apply.
Choose all that apply
- Periodic inspection
- Response to a visible change in structural condition
- Response to a reported or suspected defect
- Post-event inspection, such as after flooding or other environmental event
- Follow-up inspection of a previously identified issue
- Other
If other, please specify
Person undertaking or leading the inspection
RequiredEnter the name of the staff member, surveyor or other competent person who undertook or led the inspection.
Written response
Inspector's organisation or role
RequiredEnter the organisation, professional practice or school role of the person undertaking or leading the inspection.
Written response
Inspection scope and conditions
Scope and areas inspected
RequiredDescribe the structures, elements, elevations, rooms, roof areas, grounds or other areas inspected and any areas excluded from the inspection.
Written response
Relevant environmental or site conditions
RequiredRecord any relevant conditions, such as flooding, nearby watercourses, historical mining activity or ground conditions. If none were relevant, state that.
Written response
Basis for the inspection frequency
RequiredFor a periodic inspection, explain how the frequency was determined with reference to building use, construction type and environmental conditions. For a reactive inspection, explain why this inspection was initiated.
Written response
Construction type or types relevant to the inspection
RequiredSelect all that apply.
Choose all that apply
- Traditional brick construction
- Steel frame
- Concrete frame
- Timber frame
- Mixed or other construction
- Not known
- Other
If other, please specify
Findings and professional advice
Visible changes in structural condition
RequiredDescribe any visible changes, defects, damage or deterioration. Include the location and apparent extent. If none were observed, state that.
Written response
Issues identified and potential consequences
RequiredRecord each issue identified and describe the potential consequence for structural safety, building use or people if the issue is not addressed.
Written response
Professional advice status
RequiredSelect the statement or statements that apply to this inspection.
Choose all that apply
- Professional advice was not considered necessary at this stage
- Professional advice was sought
- Professional advice was received
- Professional advice is required or remains outstanding
- Urgent professional advice is required
- Other
If other, please specify
Professional advice details
If professional advice was sought, received or is required, record the adviser or organisation, date, scope, recommendations and any limitations. If not applicable, state that.
Written response
Actions and interim controls
Immediate actions taken or required
RequiredRecord actions taken or required to address the findings, including escalation, restrictions, isolation, repair, monitoring or further investigation.
Written response
Interim controls
RequiredIf remedial work is not yet complete, describe the interim controls in place, the areas or activities affected and how the controls will be monitored. If no interim controls are needed, state that.
Written response
Action priority
RequiredSelect the priority assigned to the required action.
Choose one
- Urgent action required
- High priority
- Planned action
- Monitor and review
- No further action currently identified
Action owner
RequiredEnter the named person or organisation responsible for progressing the required action.
Written response
Target completion or review date
RequiredEnter the date by which the action is expected to be completed or reviewed.
- Day
- Month
- Year
Estimated cost in pounds
If known, enter the estimated cost of the required remedial action. Enter zero if no cost is expected.
Number
Minimum: 0 · Maximum: 1000000000
Follow-up and evidence
Current action status
RequiredSelect the current status of the required action.
Choose one
- Not started
- In progress
- Complete
- Managed with interim controls
- Awaiting professional advice
- Closed with no further action identified
- Other
If other, please specify
Completion or ongoing management details
RequiredIf the action is complete, record what was done, by whom and when. If it remains open or is managed with interim controls, record the next steps, review arrangements and any outstanding advice.
Written response
Evidence reviewed or retained
RequiredDescribe the evidence supporting the inspection findings or action status, such as inspection notes, professional reports, work records, invoices, certificates or follow-up observations. Do not upload documents in this form.
Written response
Next review or inspection date
RequiredEnter the date for the next review, follow-up inspection or confirmation that no further review is currently required.
- Day
- Month
- Year
Record reviewed by
RequiredEnter the name and role of the person who reviewed this record.
Written response
Record review date
RequiredEnter the date on which this record was reviewed.
- Day
- Month
- Year
I have checked that this record accurately reflects the inspection findings, identified actions and current action status.
RequiredTick only after checking the information recorded in this form.
- Tick when complete