School Work-at-Height Equipment Inspection Checklist

Record pre-use and periodic checks of work-at-height equipment and scaffolding arrangements, including defect controls and competence confirmation where scaffolding is erected or used.

Checklist
CalmComplianceChecklist template

School Work-at-Height Equipment Inspection Checklist

Version
v1
Updated
1 October 2026
Who this checklist is for
Maintained and academy schools in England using work-at-height equipment. Complete only the sections relevant to equipment and scaffolding arrangements present at the school.
Jurisdiction
england

15 checklist steps

Blank response areas · preview only

  1. Identify the inspection scope

    Select all equipment or arrangements included in this inspection.

    Choose all that apply

    • Roof-edge protection
    • Harness eyebolts or systems
    • Window-cleaning equipment or systems
    • Scaffolding arrangements
    • Other work-at-height equipment
  2. Record the inspection type

    Select whether this is a pre-use inspection or a periodic inspection.

    Choose one

    • Pre-use inspection
    • Periodic inspection
  3. Record inspection details

    Response required

    Record the inspection date, location, equipment or arrangement identifier, and inspector name.

    Date; location; equipment or arrangement identifier; inspector name

  4. Check suitability

    Check that each item included in this inspection is suitable for the intended work-at-height activity and location.

    • Yes
    • No
    • Not applicable

    Notes

  5. Check stability

    Check that each item included in this inspection is stable for its intended use.

    • Yes
    • No
    • Not applicable

    Notes

  6. Check strength

    Check that each item included in this inspection is sufficiently strong for its intended use, using the available equipment information and inspection evidence.

    • Yes
    • No
    • Not applicable

    Notes

  7. Check condition

    Inspect the equipment or arrangement for signs that it is not in good condition, including damage, deterioration, looseness, missing parts or other visible defects.

    • Yes
    • No
    • Not applicable

    Notes

  8. Check roof-edge protection where present

    If roof-edge protection is included in this inspection, inspect it for suitability, stability, sufficient strength and good condition. If it is not present or not included, record this step as not applicable.

    • Yes
    • No
    • Not applicable

    Notes

  9. Check harness eyebolts or systems where present

    If harness eyebolts or systems are included in this inspection, inspect them for suitability, stability, sufficient strength and good condition. If they are not present or not included, record this step as not applicable.

    • Yes
    • No
    • Not applicable

    Notes

  10. Check window-cleaning systems where present

    If systems used to secure window-cleaning equipment are included in this inspection, inspect them for suitability, stability, sufficient strength and good condition. If they are not present or not included, record this step as not applicable.

    • Yes
    • No
    • Not applicable

    Notes

  11. Check scaffolding arrangements where present

    If scaffolding is included in this inspection, check the arrangement for suitability, stability, sufficient strength and good condition. If scaffolding is not present or not included, record this step as not applicable.

    • Yes
    • No
    • Not applicable

    Notes

  12. Confirm scaffolding competence where applicable

    If scaffolding is being erected or used, confirm that the persons erecting and using it are competent for those activities. If scaffolding is not being erected or used, record this step as not applicable.

    • Yes
    • No
    • Not applicable

    Notes

  13. Record defects and restrictions

    Response required

    Record every defect, suspected defect or condition that prevents confirmation of suitability, stability, sufficient strength or good condition. Identify the affected equipment or arrangement and record any restriction placed on its use pending assessment or corrective action.

    Equipment or arrangement; defect or concern; use restriction; action required

  14. Control identified defects

    Where a defect or concern is identified, ensure the affected equipment or arrangement is not relied on for work at height until its suitability and condition have been assessed and any necessary action has been completed. Record the responsible person and follow-up status.

  15. Record follow-up

    Response required

    Record the person responsible for each follow-up action, the action taken or planned, and the date of review.

    Responsible person; action; review date; status

CalmCompliance · v1Template for adaptation

Template details

Type
Checklist
Version
v1
Updated
1 October 2026

Get this template

Free, editable Word document. We’ll email you a download link. No Calm account needed.

Edit in Word or Google Docs.

We record your email and the template you request. Read our privacy policy.

School Work-at-Height Equipment Inspection Checklist template - CalmCompliance