Checklists

School premises site inspection checklist

Support proportionate inspections of premises-related hazards by recording the inspection scope, responsible persons, findings, remedial actions and close-out.

Checklist
CalmComplianceChecklist template

School premises site inspection checklist

Version
v1
Updated
1 October 2026
Who this checklist is for
Premises staff, site managers, facilities teams and other persons authorised by maintained and academy primary and secondary schools in England to carry out premises-related inspections.
Jurisdiction
england

24 checklist steps

Blank response areas · preview only

  1. Confirm that the inspection is applicable

    Use this checklist where premises condition or site hazards form part of the school's risk profile. Record any areas or hazards that are outside the scope of this inspection.

  2. Record the inspection scope

    Response required

    State the buildings, rooms, grounds, access routes, equipment or particular premises-related hazards included in this inspection.

    For example: main building, external paths and playground areas

  3. Record the inspection date and time

    Response required

    Enter the date and time at which the inspection was carried out.

    Date and time

  4. Identify the person carrying out the inspection

    Response required

    Record the name and role of each person who carried out or supported the inspection.

    Name and role

  5. Identify the responsible person

    Response required

    Record the person responsible for reviewing findings and coordinating any remedial action.

    Name, role or team

  6. Record the inspection trigger

    State whether this inspection is periodic or has been prompted by a reported issue, change, incident, planned work or another reason.

    Choose one

    • Periodic inspection
    • Reported issue
    • Change to premises, use or activity
    • Incident or near miss
    • Planned maintenance or construction work
    • Other
  7. Review relevant information before starting

    Review available previous inspection records, reported defects, maintenance information and relevant local arrangements for the areas within scope.

    • Yes
    • No
    • Not applicable

    Notes

  8. Inspect access and circulation routes

    Inspect entrances, exits, corridors, stairs, ramps, paths and other circulation routes within scope. Record defects, obstructions, damage or conditions that may affect safe use.

    • Yes
    • No
    • Not applicable

    Notes

  9. Inspect floors and surfaces

    Inspect floors, steps, paving and other surfaces within scope. Record deterioration, unevenness, wetness, loose materials or other conditions requiring attention.

    • Yes
    • No
    • Not applicable

    Notes

  10. Inspect doors, gates and windows

    Inspect doors, gates, windows and associated fittings within scope. Record damage, defective operation, unsecured access or other concerns.

    • Yes
    • No
    • Not applicable

    Notes

  11. Inspect lighting and visibility

    Inspect lighting and visibility in the areas within scope. Record failed, damaged or obstructed lighting and areas where visibility appears inadequate for the intended use.

    • Yes
    • No
    • Not applicable

    Notes

  12. Inspect external areas and boundaries

    Where external areas are within scope, inspect grounds, play areas, paths, boundary features, drainage features and other relevant external premises. Record defects or hazards observed.

    • Yes
    • No
    • Not applicable

    Notes

  13. Inspect building fabric and visible services

    Inspect accessible building fabric and visible service installations within scope. Do not interfere with equipment or installations. Record damage, deterioration, leaks, exposed components or other concerns.

    • Yes
    • No
    • Not applicable

    Notes

  14. Inspect storage and housekeeping

    Inspect storage areas and housekeeping arrangements within scope. Record unstable storage, blocked access, unsuitable storage, waste or other conditions requiring attention.

    • Yes
    • No
    • Not applicable

    Notes

  15. Record findings

    Response required

    Record each finding clearly, including its location, the condition observed, the potential consequence and any supporting evidence such as a photograph or related record.

    Finding, exact location and supporting evidence

  16. Record the status of each finding

    For each finding, record its current status and identify any finding that requires further review.

    Choose one

    • No issue identified
    • Monitor or review
    • Remedial action required
    • Specialist review required
    • Local arrangement or risk assessment review required
  17. Record remedial actions

    For every finding requiring action, record the action needed, the person or team responsible, the intended completion date and any resources or permissions needed.

    Action, responsible person or team, intended completion date and dependencies

  18. Record interim controls

    Where remedial work is not completed during the inspection, record any interim control or restriction put in place under the school's arrangements.

    Interim control, restriction or escalation

  19. Escalate findings requiring further review

    Pass findings requiring specialist advice, additional resources, a change to local arrangements or other escalation to the identified responsible person.

    • Yes
    • No
    • Not applicable

    Notes

  20. Check remedial action completion

    Review each recorded action and confirm whether it has been completed, remains in progress or is overdue.

    Choose one

    • Completed
    • In progress
    • Overdue
    • Not applicable
  21. Record close-out evidence

    For completed actions, record the completion date, person confirming completion and evidence reviewed. For incomplete actions, record the next review or escalation step.

    Completion or follow-up evidence

  22. Record unresolved matters

    List any findings that remain unresolved at the end of the inspection and state how they will be tracked.

    Unresolved finding and tracking arrangement

  23. Share the inspection record

    Provide the completed record to the responsible person and retain it in the school's chosen record-keeping system in accordance with local arrangements.

    • Yes
    • No
    • Not applicable

    Notes

  24. Record follow-up arrangements

    Record any follow-up inspection, review or communication needed, including who will carry it out and when it should occur.

    Follow-up action, responsible person and planned date

CalmCompliance · v1Template for adaptation

Template details

Type
Checklist
Version
v1
Updated
1 October 2026

Get this template

Free, editable Word document. We’ll email you a download link. No Calm account needed.

Edit in Word or Google Docs.

We record your email and the template you request. Read our privacy policy.