Checklists

School Premises Access Route and Safety Glazing Inspection Checklist

Inspect school corridors, stairs, passageways, external paths and applicable safety-critical glazing; record condition issues, obstructions, markings, protection, ownership, immediate controls and close-out evidence.

Checklist
CalmComplianceChecklist template

School Premises Access Route and Safety Glazing Inspection Checklist

Version
v1
Updated
1 October 2026
Who this checklist is for
Staff or contractors carrying out premises inspections in maintained and academy schools in England.
Jurisdiction
england

15 checklist steps

Blank response areas · preview only

  1. Confirm the inspection scope

    Response required

    Identify the school building areas and external access routes included in this inspection, including corridors, stairs, passageways and external paths.

    List buildings, areas and routes inspected

  2. Inspect floors and routes

    Inspect each included floor and access route for suitability, condition and obstructions.

  3. Record access-route condition

    Record the inspection finding for the floors and access routes.

    Choose one

    • No condition issue or obstruction observed
    • Condition issue or obstruction observed
    • Area or route not present in the inspection scope
  4. Describe access-route issues

    Response required

    If a condition issue or obstruction was observed, identify its location and describe the issue. If none was observed, record that no issue was identified.

    Location and description, or no issue identified

  5. Record the responsible owner

    Response required

    For each access-route issue, record the person, team or contractor responsible for addressing it. If no issue was identified, record that an owner was not required.

    Responsible person, team or contractor

  6. Apply immediate controls where needed

    Response required

    Where an access-route issue presents an immediate concern, record the temporary control applied or the reason no immediate control was required.

    Temporary control, restriction, escalation or reason not required

  7. Identify applicable glazing

    Check whether windows or transparent or translucent surfaces are present in walls, partitions, doors or gates within the inspection scope.

    Choose one

    • Applicable glazing present
    • No applicable glazing present
  8. Inspect applicable glazing

    If applicable glazing is present, inspect the windows and transparent or translucent surfaces in walls, partitions, doors and gates. Check whether each is made from safety material or protected against breakage and is appropriately marked.

  9. Record glazing findings

    If applicable glazing is present, record the overall inspection finding.

    Choose one

    • Safety material or protection and appropriate marking observed
    • Safety material, protection or appropriate marking could not be confirmed or an issue was observed
    • Some applicable glazing was satisfactory and some requires follow-up
    • No applicable glazing present
  10. Describe glazing issues

    Response required

    If a glazing issue or unconfirmed condition was identified, record the exact location, surface type and issue. If no issue was identified, record that no issue was identified.

    Location, surface type and issue, or no issue identified

  11. Record the glazing issue owner

    Response required

    For each glazing issue or unconfirmed condition, record the person, team or contractor responsible for investigation or corrective action. If none was identified, record that an owner was not required.

    Responsible person, team or contractor

  12. Apply immediate glazing controls

    Response required

    Where a glazing issue presents an immediate concern, record the temporary control applied or the reason no immediate control was required.

    Temporary control, restriction, escalation or reason not required

  13. Record required actions

    Response required

    For every recorded access-route or glazing issue, document the action required, including any investigation, repair, protection, marking, removal of obstruction or other follow-up identified during the inspection.

    Action required for each issue

  14. Record close-out evidence

    Response required

    Record the evidence used to confirm that each recorded issue was addressed, such as a completion record, work order reference, photograph, inspection note or other available evidence. If an issue remains open, record its current status and next follow-up.

    Evidence reference and close-out status for each issue

  15. Complete the inspection record

    Review all entries for completeness and ensure that locations, findings, responsible owners, immediate controls, required actions and close-out evidence have been recorded for every issue.

CalmCompliance · v1Template for adaptation

Template details

Type
Checklist
Version
v1
Updated
1 October 2026

Get this template

Free, editable Word document. We’ll email you a download link. No Calm account needed.

Edit in Word or Google Docs.

We record your email and the template you request. Read our privacy policy.

School Premises Access Route and Safety Glazing Inspection Checklist template - CalmCompliance