School Work Equipment Defect and Return-to-Service Record
- Version
- v2
- Updated
- 7 October 2026
- Audience
- Primary and secondary schools in England, including maintained schools and academies, excluding independent schools.
- Jurisdiction
- england
Blank fields · read-only preview
Use this record when work equipment or a powered gate is found to be dangerous or has a defect that could affect safe use. Record the defect, controls, assessment, corrective work, verification and authorisation before considering return to service.
1. Equipment and incident details
School name
RequiredEnter the name of the school where the equipment is located or controlled.
Enter school name
Equipment or powered gate name
RequiredIdentify the equipment clearly, including its normal location if useful.
Enter equipment name and location
Asset, serial or other identifier
RequiredEnter the asset number, serial number or another identifier. If none exists, state that no identifier is available.
Enter identifier or state none available
Equipment type
RequiredSelect all types that apply.
Choose all that apply
- Powered gate
- Workshop or design-and-technology machinery
- Grounds-maintenance equipment
- Cleaning equipment
- Kitchen or catering equipment
- Lifting equipment
- Other work equipment
- Other
If other, please specify
Date defect or dangerous condition was discovered
RequiredEnter the date on which the defect or dangerous condition was identified.
- Day
- Month
- Year
Person reporting the defect
RequiredEnter the name of the person who identified or reported the defect.
Enter name
Description of defect or dangerous condition
RequiredDescribe what was observed, when it was observed and how it could affect safe use. Include relevant error messages, unusual operation, damage or deterioration.
Describe the defect or dangerous condition
Immediate risk presented
RequiredSelect all risks that apply to the identified condition.
Choose all that apply
- Entanglement, crushing or trapping
- Contact with moving parts
- Electric shock or electrical hazard
- Unexpected start, movement or operation
- Collapse, falling object or structural failure
- Cutting, impact or ejection of material
- Other risk
- Other
If other, please specify
2. Immediate isolation and warning controls
Was the equipment taken out of use immediately where it was found to be dangerous?
RequiredSelect the applicable status. If it was not possible to take the equipment out of use immediately, explain why in the next field and record the interim restriction.
Choose one
- Yes—taken out of use and isolated
- Use restricted pending isolation or further control
- Not yet isolated
- Condition assessed as defective but not dangerous for current controlled use
Isolation, restriction and warning controls applied
RequiredRecord the physical or administrative controls applied, such as disconnection, locking off, removal of keys, barriers, warning notices, supervision or restricted access.
Describe controls applied
Date isolation or restriction was applied
RequiredEnter the date on which the equipment was isolated or use was restricted.
- Day
- Month
- Year
Person responsible for applying the isolation or restriction
RequiredEnter the name of the person who applied or arranged the control.
Enter name
Interim use conditions or reason immediate isolation was not possible
RequiredComplete this where use remains restricted, controlled or unavoidable pending isolation. Otherwise state that it is not applicable.
Enter interim conditions or state not applicable
3. Competent-person assessment and corrective work
Competent person assessing the equipment
RequiredEnter the name of the person who assessed the equipment and their organisation or role.
Enter name, role and organisation
Date of competent-person assessment
RequiredEnter the date on which the equipment was assessed.
- Day
- Month
- Year
Assessment findings
RequiredRecord the identified failure, deterioration, affected safeguards, inspection or testing required and whether the equipment can remain unavailable pending corrective work.
Record assessment findings
Corrective work status
RequiredSelect the current status of work needed to address the safety concern.
Choose one
- Not started
- In progress
- Completed
- Equipment replaced
- Further work required
- Other
If other, please specify
Corrective work completed or planned
RequiredDescribe repairs, adjustments, replacement parts, guarding, control changes, inspection, testing or other action. Include any outstanding work and the person or contractor responsible.
Describe corrective work
Date corrective work was completed
RequiredEnter the completion date if corrective work has been completed; otherwise enter the planned date or state that no completion date has been set.
- Day
- Month
- Year
4. Verification and return-to-service decision
Person responsible for verification
RequiredEnter the name, role and organisation of the person who verified the equipment after corrective work.
Enter name, role and organisation
Date of verification
RequiredEnter the date on which post-work verification was carried out.
- Day
- Month
- Year
Verification and testing completed
RequiredRecord the inspection, testing, adjustment or other verification performed, including the safeguards and operating conditions checked.
Record verification and testing
Verification outcome
RequiredSelect the outcome supported by the verification recorded above.
Choose one
- Suitable for return to service
- Remain out of use
- Use only under specified restrictions
- Further corrective work or verification required
Conditions and controls for return to service
RequiredComplete if return to service is being considered. State any operating limits, user competence requirements, supervision, inspections, maintenance or monitoring needed. If return to service is not being considered, state that it remains out of use.
Record return-to-service conditions or state that it remains out of use
Person authorising the recorded return-to-service decision
RequiredEnter the name and role of the person with authority to accept the verification outcome and recorded controls.
Enter name and role
Date of authorisation decision
RequiredEnter the date on which the recorded decision was authorised.
- Day
- Month
- Year
Record closure confirmation
RequiredSelect this only when the recorded isolation, corrective work, verification outcome and authorisation decision have been reviewed for completeness.
- Tick when complete
Follow-up actions and review date
RequiredRecord any outstanding actions, planned review, monitoring or updates to inspection and maintenance arrangements. If none are required, state this.
Record follow-up actions or state none required