School Asbestos Work Permit and Contractor Control Procedure
- Version
- v2
- Updated
- 7 October 2026
Fields in brackets are completed when you adapt this template.
This procedure applies to [school name], a maintained or academy school in England, where school-controlled work may disturb asbestos or the building fabric. Permit and contractor controls must be proportionate to the work and to the asbestos information available.
1. Determine whether asbestos may be disturbed
Before approving work described as [work description] in [work area], the [responsible role] must determine whether the work may disturb the building fabric or any asbestos materials, including unidentified, presumed or hidden materials.
Where the work will disturb the fabric of the building, arrange the relevant refurbishment or demolition survey where required. A refurbishment or demolition survey is an intrusive survey involving destructive inspection by a trained specialist to identify asbestos materials.
2. Provide asbestos information
Before the work starts on [work start date], provide the findings of the relevant surveys and details of known or presumed asbestos materials in the work area to the designers and workers who will undertake the work.
The [responsible role] must confirm that the information provided is sufficient for the people undertaking the work to understand the asbestos risk and the controls required for the planned activity. Refer to survey [survey reference] when communicating the asbestos information.
3. Check the contractor and work arrangements
Before permitting [contractor name] to undertake the work, check that the contractor is competent for the proposed activity and that any required asbestos licensing arrangements are in place.
All licensed asbestos work must be undertaken by a licensed asbestos removal contractor. Some small, short-duration tasks may be carried out by non-licensed workers only where they have received appropriate training and the correct risk control measures are used.
Use the applicable HSE advice on licensable, notifiable non-licensed and non-licensed work when determining the contractor and licensing requirements for the planned activity.
4. Review the method statement and controls
Review the contractor's method statement and proposed risk control measures against the asbestos information for the work area. The controls must address the risk identified for the planned activity and must be suitable for the information available.
If the information provided is not sufficient for those undertaking the work to confirm the required controls, do not permit the work to proceed until the information and controls have been clarified.
5. Issue and control the work permit
Use a permit-to-work system where it is the proportionate means of ensuring that the survey information, asbestos information and risk control measures are communicated and applied. The [responsible role] may issue permit [permit reference] only after the work scope, relevant asbestos information, contractor arrangements and control measures have been considered.
The permit must identify the authorised work area and activity and must be available to the designers and workers undertaking the permitted work. Work must remain within the activity and area authorised by the permit.
6. Control work before restart
If permitted work is stopped or interrupted, do not authorise its restart until the [restart authoriser] has confirmed that the asbestos information, work scope and required control measures remain sufficient for the work to continue.
Where the proposed activity, work area or available asbestos information changes, reassess whether the work may disturb asbestos and apply this procedure again before the changed work proceeds.
7. Legal basis
When commissioning construction work, the Construction (Design and Management) Regulations 2015 require the school to determine whether there is a risk that the work might disturb asbestos materials. Where the work will disturb the building fabric, a relevant refurbishment or demolition survey is required where applicable, and survey findings and details of known or presumed asbestos materials must be passed to those doing the work.