Checklists

School Weekly Fire Alarm Test Checklist

Record the weekly operational fire-alarm test, including the manual call point selected, test result, faults, immediate controls and escalation. Where multiple manual call points exist, support rotation so different call points are tested over time.

Checklist
CalmComplianceChecklist template

School Weekly Fire Alarm Test Checklist

Version
v2
Updated
7 October 2026
Who this checklist is for
Staff responsible for operational fire-alarm testing in maintained and academy schools in England with a fire detection and alarm system.
Jurisdiction
england

10 checklist steps

Blank response areas · preview only

  1. Follow the established testing procedure

    Use the school's established fire-alarm testing procedure and any applicable site arrangements before carrying out the test.

  2. Record the test date

    Response required

    Enter the date on which this weekly test is carried out.

    DD/MM/YYYY

  3. Record the person carrying out the test

    Response required

    Enter the name or role of the person carrying out the test.

    Written response

  4. Identify the manual call point arrangement

    Select whether the system has one manual call point or multiple manual call points.

    Choose one

    • One manual call point
    • Multiple manual call points
  5. Record the manual call point selected

    Response required

    Enter the identifier or location of the manual call point selected for this week's test. Where multiple manual call points exist, select a different one each week so that all are eventually included in the testing schedule.

    Identifier or location

  6. Record the test result

    Select the outcome of the weekly fire-alarm test.

    Choose one

    • Pass
    • Fault found
    • Unable to complete
  7. Record faults or abnormal observations

    Response required

    If a fault or abnormal observation was identified, record the details. If none was identified, enter “None observed”.

    Fault or observation details

  8. Record immediate controls

    Response required

    If a fault was found or the test could not be completed, record any immediate controls put in place. If none were required, enter “None recorded”.

    Immediate controls

  9. Record escalation

    Response required

    If a fault was found or the test could not be completed, record who was notified, when they were notified and any follow-up reference. If no escalation was made, explain why.

    Person or role notified, date/time and reference

  10. Record periodic inspection arrangements

    Response required

    Record the arrangements or reference for the quarterly and annual inspections and tests by a competent person. This is separate from the weekly operational test.

    Arrangement or reference

CalmCompliance · v2Template for adaptation

Template details

Type
Checklist
Version
v2
Updated
7 October 2026

Get this template

Free, editable Word document. We’ll email you a download link. No Calm account needed.

Edit in Word or Google Docs.

We record your email and the template you request. Read our privacy policy.