Checklists

School Premises Access Route and Safety Glazing Inspection Checklist

Inspect school corridors, stairs, passageways, external paths and applicable safety-critical glazing, and record defects, obstructions, markings, protection, responsible owners, immediate controls and close-out evidence.

Checklist
CalmComplianceChecklist template

School Premises Access Route and Safety Glazing Inspection Checklist

Version
v2
Updated
7 October 2026
Who this checklist is for
Staff responsible for premises inspections in maintained and academy primary and secondary schools in England.
Jurisdiction
england

19 checklist steps

Blank response areas · preview only

  1. Record inspection details

    Response required

    Record the inspection date, inspector name or role, and the building or external area covered.

    Date, inspector and area

  2. Identify access routes

    Response required

    List the corridors, stairs, passageways and external paths included in this inspection.

    List each route or area inspected

  3. Inspect route suitability and condition

    Inspect each listed access route for suitability and visible condition issues, including corridors, stairs, passageways and external paths.

    • Yes
    • No
    • Not applicable

    Notes

  4. Check for obstructions

    Check each listed access route for obstructions that could interfere with access or movement.

    • Yes
    • No
    • Not applicable

    Notes

  5. Record access-route outcome

    Select the outcome for the access routes inspected.

    Choose one

    • No issue observed
    • Condition issue or obstruction recorded
    • Area could not be inspected
  6. Describe access-route issues

    If a condition issue, obstruction or uninspected area was identified, record the precise location, observed issue and any affected route.

    Location and description

  7. Record immediate controls

    Where an issue requires an immediate control, record the control used or required and identify any area that remains affected.

    Control and affected area

  8. Assign responsibility

    For each recorded issue, identify the responsible person, role or team for action.

    Responsible person, role or team

  9. Determine whether glazing checks apply

    Identify whether windows or transparent or translucent surfaces are present in walls, partitions, doors or gates within the inspection area.

    Choose one

    • Present
    • Not present
    • Presence could not be determined
  10. List applicable glazing

    If glazing is present, list the windows and transparent or translucent surfaces in walls, partitions, doors or gates to be checked.

    Location and type of glazing

  11. Check glazing material or protection

    If applicable glazing is present, check whether each window or transparent or translucent surface is made from a safety material or is protected against breakage.

    • Yes
    • No
    • Not applicable

    Notes

  12. Check glazing markings

    If applicable glazing is present, check whether each window or transparent or translucent surface is appropriately marked.

    • Yes
    • No
    • Not applicable

    Notes

  13. Record glazing outcome

    If glazing checks apply, select the outcome for the glazing inspected.

    Choose one

    • No issue observed
    • Material, protection or marking issue recorded
    • Could not confirm material, protection or marking
  14. Describe glazing issues

    If a glazing issue or uncertainty was identified, record the precise location, surface type and the material, protection or marking issue observed.

    Location and glazing issue

  15. Record glazing controls

    Where a glazing issue requires an immediate control, record the control used or required and identify any affected area.

    Control and affected area

  16. Assign glazing responsibility

    For each recorded glazing issue, identify the responsible person, role or team for action.

    Responsible person, role or team

  17. Create the formal issue record

    Formally record each access-route or glazing condition issue, including its location, description, responsible owner and any immediate control.

    • Yes
    • No
    • Not applicable

    Notes

  18. Record close-out evidence

    For each issue addressed, record the action taken, the date, the person or team providing the evidence and the evidence reference or description.

    Action, date, person or team and evidence reference

  19. Record outstanding follow-up

    Record any issue requiring further action or reinspection, including the responsible owner and the next follow-up action.

    Outstanding action and follow-up

CalmCompliance · v2Template for adaptation

Template details

Type
Checklist
Version
v2
Updated
7 October 2026

Get this template

Free, editable Word document. We’ll email you a download link. No Calm account needed.

Edit in Word or Google Docs.

We record your email and the template you request. Read our privacy policy.