School New Machinery Commissioning and Acceptance Checklist

Record pre-use acceptance checks for newly acquired or installed machinery and other work equipment at maintained and academy primary or secondary schools in England.

Checklist
CalmComplianceChecklist template

School New Machinery Commissioning and Acceptance Checklist

Version
v2
Updated
7 October 2026
Who this checklist is for
School leaders, premises managers, competent machinery users, procurement staff and other persons responsible for commissioning and accepting new machinery or work equipment.
Jurisdiction
england

17 checklist steps

Blank response areas · preview only

  1. Confirm checklist applicability

    Use this checklist when the school acquires, installs, assembles or commissions new machinery or other work equipment. Record the equipment covered by this checklist.

  2. Record equipment details

    Response required

    Record the equipment name, make, model, serial or asset number, location and commissioning date.

    Enter equipment identification and location details

  3. Confirm intended use and users

    Confirm that the intended location, purpose, method of use and user group have been considered before acceptance.

    • Yes
    • No
    • Not applicable

    Notes

  4. Check purchase and specification records

    Check that the purchase or specification records describe the intended use and relevant safety requirements for the equipment. Retain the records with the commissioning documentation.

    • Yes
    • No
    • Not applicable

    Notes

  5. Check supplier requirements

    For complex or custom-built equipment, check that the school's requirements were discussed with the supplier and that the supplied equipment matches the agreed specification.

    • Yes
    • No
    • Not applicable

    Notes

  6. Check Declaration of Conformity

    Check that the equipment is accompanied by the relevant Declaration of Conformity where required, and record where the document is stored.

    • Yes
    • No
    • Not applicable

    Notes

  7. Check English instructions

    Check that English user instructions are available and state how the machinery should be used and maintained. Make the instructions available to relevant users.

    • Yes
    • No
    • Not applicable

    Notes

  8. Check installation or assembly evidence

    Where installation or assembly is required, check that the installation or assembly has been completed in accordance with the equipment requirements and that supporting evidence is available.

    • Yes
    • No
    • Not applicable

    Notes

  9. Identify installation-dependent lifting equipment

    Determine whether the equipment is lifting equipment that requires assembly or installation before use, or whose safety depends on its installation conditions.

    Choose one

    • Yes
    • No
    • Uncertain
  10. Obtain required lifting-equipment examination

    Response required

    If the equipment is installation-dependent lifting equipment, do not accept it for use until a competent person has examined it after assembly or installation and before use at the relevant location, confirming that it was correctly and safely installed. Record the examination evidence and competent person's details.

    Enter examination reference, date and competent person's details, or record that this conditional check is not applicable

  11. Check risk assessment

    Check that a documented risk assessment has considered the risks arising from the equipment's intended use and maintenance, including who will use it and how it will be used.

    • Yes
    • No
    • Not applicable

    Notes

  12. Check guards

    Inspect the equipment for missing or inadequate guards and record any defect or unresolved issue. Do not accept equipment with an identified guard defect for use until the issue has been addressed.

    • Yes
    • No
    • Not applicable

    Notes

  13. Check for obvious unsafe conditions

    Check that the equipment is not obviously unsafe in light of how it will be used and maintained. Record any defect, missing component or unresolved safety concern.

    • Yes
    • No
    • Not applicable

    Notes

  14. Record outstanding actions

    Response required

    Record any defects, missing documents, incomplete installation work, examination requirements or other actions that must be closed before acceptance.

    Enter outstanding actions, responsible person and closure evidence, or record that none were identified

  15. Record acceptance decision

    Select the current commissioning decision. Equipment must not be accepted for use while required checks or corrective actions remain incomplete.

    Choose one

    • Accepted for use
    • Not accepted for use
    • Requires further review
  16. Record acceptance authorisation

    Response required

    Record the name, role, signature or approval reference and date of the person authorised to accept or reject the equipment for use.

    Enter authoriser details and date

  17. File commissioning records

    File this completed checklist with the purchase or specification records, Declaration of Conformity, English user and maintenance instructions, installation or assembly evidence, risk assessment, examination evidence where applicable, defect records and acceptance authorisation.

    • Yes
    • No
    • Not applicable

    Notes

CalmCompliance · v2Template for adaptation

Template details

Type
Checklist
Version
v2
Updated
7 October 2026

Get this template

Free, editable Word document. We’ll email you a download link. No Calm account needed.

Edit in Word or Google Docs.

We record your email and the template you request. Read our privacy policy.