Checklists

School Lifting Equipment Thorough Examination Schedule for People-Lifting Equipment and Accessories

Schedule and assurance checklist for arranging and recording LOLER thorough examinations of equipment used to lift people and lifting accessories, including competent-person reports, next-due dates, defect actions and additional examination triggers.

Checklist
CalmComplianceChecklist template

School Lifting Equipment Thorough Examination Schedule for People-Lifting Equipment and Accessories

Version
v2
Updated
7 October 2026
Who this checklist is for
Maintained and academy primary and secondary schools in England that use equipment to lift people or use lifting accessories.
Jurisdiction
england

18 checklist steps

Blank response areas · preview only

  1. Confirm applicability

    Use this schedule where the school uses equipment to lift people or uses lifting accessories. If neither applies, record that this schedule is not applicable.

    Choose one

    • Equipment used to lift people
    • Lifting accessories used
    • Both apply
    • Neither applies
  2. Identify equipment and accessories

    Response required

    List each item covered by this schedule, including its description, location and an identifying reference if one is used by the school.

    Equipment or accessory description; location; identifying reference

  3. Classify the item

    Select the applicable category for each item in the schedule.

    Choose one

    • Equipment used to lift people
    • Lifting accessory
    • Both categories apply or classification requires confirmation
  4. Check for a written examination scheme

    Check whether a competent person has issued a written examination scheme for the item. The schedule must be replaced or adjusted where that scheme specifies different examination intervals.

    Choose one

    • Written examination scheme present
    • No written examination scheme available
    • Status requires confirmation
  5. Record scheme details where applicable

    Response required

    Where a written examination scheme is present, record its reference, specified interval and any conditions that affect the interval. Where no scheme is present, record that fact.

    Scheme reference and specified interval or confirmation that no scheme is available

  6. Apply the interval where no different written scheme applies

    For equipment used to lift people, record a thorough examination interval of 6 months unless a written examination scheme specifies a different interval. For lifting accessories, record a thorough examination interval of 6 months unless a written examination scheme specifies a different interval.

  7. Record the applicable interval

    Response required

    Record the examination interval that applies to this item, based on the written examination scheme where one exists or the applicable default interval where it does not.

    Applicable examination interval

  8. Arrange examination by a competent person

    Arrange the thorough examination with a competent person at the applicable interval.

    • Yes
    • No
    • Not applicable

    Notes

  9. Record the latest examination date

    Response required

    Enter the date of the latest thorough examination, or record that no examination has yet been recorded.

    Date or no examination recorded

  10. Record the next due date

    Response required

    Record the next due date calculated from the applicable written examination scheme or interval.

    Next due date

  11. Retain the written report

    Response required

    Retain the competent person's written thorough-examination report and record its reference or storage location.

    Report reference or storage location

  12. Record the report outcome

    Record the outcome stated in the written report and whether the report identifies any defect requiring action.

    Choose one

    • No defect requiring action recorded
    • Defect requiring action recorded
    • Written report not available
    • Outcome requires clarification
  13. Act on reported defects

    Response required

    Where the written report identifies a defect, record the action required, the person responsible, the target date and the current status. Do not treat the item as cleared without supporting evidence.

    Defect; action; responsible person; target date; status; supporting record

  14. Check for additional examination triggers

    Check whether any event has occurred since the last examination that requires an additional thorough examination.

    Choose one

    • No applicable event known
    • Accident
    • Dangerous occurrence
    • Significant change in conditions of use
    • Replacement of parts subject to thorough examination
    • Long period of inaction
    • More than one applicable event
    • Event status requires confirmation
  15. Record additional examination triggers

    Response required

    Where an accident, dangerous occurrence, significant change in conditions of use, replacement of a part subject to thorough examination or a long period of inaction has occurred, record the event, date, item affected and the action taken to arrange an additional thorough examination.

    Event; date; item affected; additional examination arranged or action required

  16. Check replacement parts before use

    Where service or repair included fitting a new part covered by LOLER, arrange the required thorough examination before the equipment is used.

  17. Record any additional examination report

    Response required

    Where an additional thorough examination has been arranged or completed following a trigger event, retain and record the competent person's written report and any defect actions.

    Additional report reference, storage location and defect actions

  18. Review the schedule

    Review this schedule whenever the equipment, its use, the written examination scheme, the examination report or relevant events change.

CalmCompliance · v2Template for adaptation

Template details

Type
Checklist
Version
v2
Updated
7 October 2026

Get this template

Free, editable Word document. We’ll email you a download link. No Calm account needed.

Edit in Word or Google Docs.

We record your email and the template you request. Read our privacy policy.

School Lifting Equipment Thorough Examination Schedule for People-Lifting Equipment and Accessories template - CalmCompliance