Checklists

School Emergency Lighting Monthly Test Checklist

Record the monthly emergency-lighting flash test, identify failed fittings or controls, and assign corrective action before the system is relied upon for escape lighting.

Checklist
CalmComplianceChecklist template

School Emergency Lighting Monthly Test Checklist

Version
v2
Updated
7 October 2026
Who this checklist is for
Primary and secondary schools in England, including maintained schools and academies, where emergency lighting is installed.
Jurisdiction
england

9 checklist steps

Blank response areas · preview only

  1. Confirm applicability

    Use this checklist where the school has emergency lighting, particularly emergency lighting serving escape routes.

  2. Record the test date

    Response required

    Enter the date on which the monthly flash test is carried out.

    DD/MM/YYYY

  3. Record the person carrying out the test

    Response required

    Enter the name or role of the person carrying out the test.

    Name or role

  4. Carry out the monthly flash test

    Carry out the monthly emergency-lighting flash test in accordance with the system's test arrangements.

    • Yes
    • No
    • Not applicable

    Notes

  5. Record the overall test result

    Select the result that reflects the emergency-lighting flash test.

    Choose one

    • No failed fittings or controls observed
    • Failed fittings or controls observed
    • Test not completed
  6. Record failed fittings or controls

    Response required

    List each failed fitting or control and identify its location. If none were observed, enter “None observed”.

    Locations and details, or None observed

  7. Assign corrective action

    Response required

    For each failed fitting or control, record the corrective action, the person or team responsible, and the planned completion date. If no failure was observed, enter “No corrective action required”.

    Action, responsible person or team, and planned completion date

  8. Record any restriction before reliance

    Record whether identified failures or an incomplete test need to be resolved before the emergency-lighting system is relied upon for escape lighting.

    Choose one

    • No restriction recorded
    • Restriction recorded
    • Not determined
  9. Consider the six-month condition test

    Where applicable, arrange and record a more detailed condition test every six months, including a three-hour battery test, by a competent person.

CalmCompliance · v2Template for adaptation

Template details

Type
Checklist
Version
v2
Updated
7 October 2026

Get this template

Free, editable Word document. We’ll email you a download link. No Calm account needed.

Edit in Word or Google Docs.

We record your email and the template you request. Read our privacy policy.

School Emergency Lighting Monthly Test Checklist template - CalmCompliance