School Air-Conditioning Bi-Annual Checks
- Version
- v2
- Updated
- 7 October 2026
- Who this checklist is for
- Primary and secondary schools in England, including maintained schools and academies, where air-conditioning systems are installed. Not intended for independent schools.
- Jurisdiction
- england
13 checklist steps
Blank response areas · preview only
Applicability
Use this checklist only where the school has air-conditioning systems and bi-annual condition checks are being maintained as best practice.
Check date
Response required
Enter the date of this bi-annual check.
DD/MM/YYYY
Person completing the check
Response required
Record the name of the person completing this check.
Written response
System or area checked
Response required
Record the air-conditioning system identifier, location, or area covered by this check.
Written response
Bi-annual check scheduled
Confirm that this record forms part of the school's bi-annual air-conditioning checking arrangement, where applicable.
- Yes
- No
- Not applicable
Notes
General condition
Check the accessible air-conditioning equipment and record whether its observed condition is acceptable or whether a defect is present.
Choose one
- No defect observed
- Defect observed
- Not checked
Observed defects
Response required
Record each observed defect, affected component or area, and any relevant supporting detail. If no defect was observed, record that explicitly.
Enter defect details or state 'No defect observed'.
Immediate action
Response required
Record any action taken during the check in response to an observed defect. If no immediate action was taken, record that explicitly.
Enter action taken or state 'No immediate action taken'.
Corrective action required
Response required
Record the corrective action required for each defect, or record that no corrective action was identified.
Describe the required corrective action.
Corrective action owner
Record the person, team, contractor, or other responsible party assigned to each corrective action.
Written response
Corrective action tracking reference
Record the maintenance request, work order, or other tracking reference used for corrective action, where one exists.
Written response
Keep inspections separate
Keep this bi-annual condition-check record separate from the energy-assessor inspection record. Where the cited inspection requirement applies, the energy-assessor inspection is a separate activity and must not be treated as completed by this checklist.
Additional notes
Record any additional observations, limitations, inaccessible areas, or documents reviewed during this check.
Written response