Checklists

Asbestos-containing material condition inspection checklist

Record regular inspections of asbestos-containing or presumed asbestos-containing materials in school buildings, including location, condition, damage or deterioration, supporting photographs or assessments where used, escalation, remedial action and links to the asbestos management plan.

Checklist
CalmComplianceChecklist template

Asbestos-containing material condition inspection checklist

Version
v1
Updated
7 October 2026
Reviewed
7 October 2026
Who this checklist is for
Staff or appointed competent persons responsible for inspecting and managing asbestos-containing or presumed asbestos-containing materials in maintained and academy primary and secondary schools.
Jurisdiction
england

18 checklist steps

Blank response areas · preview only

  1. Confirm applicability

    Use this checklist where asbestos-containing or presumed asbestos-containing materials remain in school buildings. Ensure the inspection arrangement reflects the materials, locations, condition and management controls.

  2. Record inspection date

    Response required

    Enter the date on which this inspection was carried out.

    YYYY-MM-DD

  3. Record inspector

    Response required

    Enter the name of the person carrying out the inspection and, where relevant, their role or organisation.

    Name and role or organisation

  4. Locate the asbestos management plan

    Use the current asbestos management plan and associated asbestos information to identify the materials and locations to be inspected.

    • Yes
    • No
    • Not applicable

    Notes

  5. Record the management plan reference

    Response required

    Enter the reference, location or link used to connect this inspection record to the asbestos management plan.

    Document reference, file path or link

  6. Identify the material and location

    Response required

    For each material inspected, record whether it is asbestos-containing or presumed asbestos-containing, together with the building, room or area and a sufficiently specific location description.

    Material status; building; room or area; precise location

  7. Record the material reference

    Enter the reference used in the asbestos register, survey, management plan or other relevant record, where available.

    Register, survey or plan reference

  8. Carry out the condition inspection

    Inspect the identified material and check its current condition without altering or disturbing it.

    • Yes
    • No
    • Not applicable

    Notes

  9. Record the observed condition

    Select the description that best records the observed condition at the time of inspection.

    Choose one

    • No change observed
    • Damage or deterioration observed
    • Unable to inspect
    • Other condition requiring explanation
  10. Describe damage or deterioration

    Response required

    If damage, deterioration, an unexpected change or an access limitation was identified, describe what was observed and where it was observed. If none was identified, record that no damage or deterioration was observed.

    Observed condition and location-specific details

  11. Record photographs where used

    If photographs were taken, record the photograph identifiers or storage location and link them to the material and location record.

    Photograph identifiers or storage location

  12. Record an assessment where used

    If a separate assessment was completed, record its reference and summarise the relevant finding or recommendation.

    Assessment reference and relevant finding

  13. Escalate damage or deterioration

    Where damage or deterioration is observed, follow the escalation arrangements in the asbestos management plan and notify the responsible person or organisation identified in those arrangements.

    • Yes
    • No
    • Not applicable

    Notes

  14. Record the escalation

    Response required

    Where escalation was required, record who was notified, when they were notified and the reference or method used. If escalation was not required, record that outcome.

    Person or organisation, date, method or reference, and outcome

  15. Record remedial action

    Response required

    Where remedial action is identified, record the action, responsible person or organisation, planned timing and current status. If no remedial action is identified, record that outcome.

    Action, responsible person or organisation, timing and status

  16. Update or cross-reference the management records

    Record this inspection and any resulting escalation or remedial action in the relevant asbestos management records, or record the cross-reference showing where the information has been entered.

    • Yes
    • No
    • Not applicable

    Notes

  17. Record follow-up arrangements

    Response required

    Enter any follow-up inspection, review or action needed and identify the person or organisation responsible. Where no follow-up is needed, record that outcome.

    Follow-up action, responsible person or organisation, and reference or date where applicable

  18. Check the inspection record

    Confirm that the material, location, observed condition, supporting evidence where used, escalation outcome and remedial-action information are recorded and linked to the asbestos management plan.

    • Yes
    • No
    • Not applicable

    Notes

CalmCompliance · v1Template for adaptation

Template details

Type
Checklist
Version
v1
Updated
7 October 2026
Reviewed
7 October 2026

Get this template

Free, editable Word document. We’ll email you a download link. No Calm account needed.

Edit in Word or Google Docs.

We record your email and the template you request. Read our privacy policy.